Invest In Crypto News
  • Home
  • Latest News
    • Bitcoin News
    • Altcoin News
    • Ethereum News
    • Blockchain News
    • Doge News
    • NFT News
    • Video
    • Market Analysis
    • Business
    • Finance
    • Politics
    • Mining
    • Regulation
    • Technology
  • Top 10 Cryptos
  • Market Cap List
  • IC DAO
  • Donations
  • Contact
  • Buy Crypto
No Result
View All Result
Invest In Crypto News
  • Home
  • Latest News
    • Bitcoin News
    • Altcoin News
    • Ethereum News
    • Blockchain News
    • Doge News
    • NFT News
    • Video
    • Market Analysis
    • Business
    • Finance
    • Politics
    • Mining
    • Regulation
    • Technology
  • Top 10 Cryptos
  • Market Cap List
  • IC DAO
  • Donations
  • Contact
  • Buy Crypto
No Result
View All Result
Invest In Crypto News
No Result
View All Result

A New Scoreboard in AI Power Arms Race

CryptoExpert by CryptoExpert
September 14, 2026
in Mining
0
A New Scoreboard in AI Power Arms Race
  • Facebook
  • Twitter
  • Pinterest


You might also like

This Fractal Bitcoin Mining Profitability Looks WRONG…

Canaan revenue misses guidance; 1,117 BTC pledged in Q2

Solo Bitcoin Miner Hits $244K Jackpot After Nearly 40-Day Drought

This article first appeared in Miner Weekly, a weekly newsletter by Blocksbridge Consulting curating the latest news in energy, compute, infrastructure, and data analysis from The Energy Mag. The original article can be viewed here.

Over the past week, a flurry of ERCOT Batch Zero announcements shows how a power arms race is playing out, with companies turning their standing in the Texas interconnection process into a public measure of competitive strength.

IREN highlighted conditional Base Load status for its 2 GW Sweetwater hub. Hut 8 (NASDAQ: HUT) flagged the designation for Beacon Point. Soluna (NASDAQ: SLNH) announced it for the full 166 MW Kati campus. A technical grid classification has become something to put in a headline—a way to show that a company’s power plans have substance behind them.

But as in the hashrate race, the largest number does not tell the whole story. The classifications distinguish capacity that retains its position based on earlier studies from requests still awaiting allocation. Behind similar announcements, companies—and projects within the same company—can be at very different stages.

okex

Galaxy’s September 8 disclosure illustrates the distinction. Five projects received conditional classifications covering approximately 4.2 GW. Of that, 1.63 GW at Helios I and II was classified as Base Load. Another 2.6 GW across Caspian, Selene and Helios III was classified as Studied Load, leaving it subject to capacity allocation.

One detail deserves particular attention: Galaxy submitted the 700 MW Caspian project as Base Load. ERCOT provisionally classified it as Studied Load. Even within one company, the headline gigawatts carry different levels of certainty.

The industry’s arms race has acquired a new scoreboard

In December 2021, MARA (NASDAQ: MARA)’s operating update offered a sharp distinction between current output and future capacity. It reported an active fleet producing approximately 3.5 EH/s, alongside purchases expected to bring its fleet to 23.3 EH/s by early 2023, which didn’t fully materialize until mid-2024.

The parallel today is the use of future capacity to establish competitive standing. Power always mattered to mining. What has changed is the prominence of grid access in the expansion story—and the possibility of using that access to serve a different computing market.

A machine order and a grid classification are different commitments, with different risks. Yet both invite the same analytical mistake: treating a milestone toward future production as though it were production already secured.

ERCOT’s predicament explains why a technical classification has become announcement-worthy.

When Texas regulators approved Batch Zero in June, ERCOT reported more than 438 GW of large-load connection requests, nearly 89% from data centers. By August 3, Governor Greg Abbott’s office cited more than 474 GW of requests, roughly 90% from data centers and more than five times ERCOT’s record peak demand. These figures measure proposed connections, not a forecast that every requested megawatt will materialize.

Studying projects individually becomes difficult when multiple campuses rely on the same transmission infrastructure. Batch Zero is the transitional group in ERCOT’s shift toward evaluating large loads together, assessing their combined effects and allocating available transmission capacity. The process generally concerns facilities of at least 75 MW with sufficient prior study work and development commitments.

Within that process, Base Load projects enter the study’s starting model without undergoing a new Batch Zero capacity allocation. Studied Load projects qualify for inclusion but still face evaluation and allocation. Projects that fail to qualify must proceed through a future interconnection process.

That makes Base Load a meaningful advantage. It also explains why “included in Batch Zero” is too broad a description for comparing developers.

CleanSpark (NASDAQ: CLSK), for example, disclosed conditional classifications for 585 MW as Base Load and 300 MW as Studied Load, a split it said was expected. Those numbers belong in separate columns when assessing its Texas portfolio.

Ionic Digital offered a more specific disclosure on Thursday. The company said its transmission provider, Texas-New Mexico Power, informed it that ERCOT had provisionally classified the remaining 466 MW requested at its Ward County campus as Base Load. Energizing that tranche would bring the campus’s total demand to 700 MW. Ionic continues to target completion by the end of 2027, subject to verification, the audit process and ERCOT’s final classification determination.

Cipher’s post on X, on the other hand, shows how much a headline number can leave unanswered. The company said initial feedback from its transmission service providers resulted in 3.2 GW of conditional Batch Zero classifications. It did not disclose how much was Base Load and how much was Studied Load, saying it was reviewing site-specific designations and would provide further details next week.

The distinction also captures the dynamics of the new power arms race: companies can announce a large number before investors have the information needed to compare it with competitors’ portfolios. Cipher’s promised follow-up will help establish what sits behind the total.

The word “conditional” adds another layer

Abbott’s August directive required verification and an audit of data centers advancing through the interconnection process. ERCOT subsequently issued provisional classifications. Its September 3 notice identifies possible conditions including successful verification, corrections to technical modeling data and regulatory exceptions where eligibility requirements were not met. Failure to satisfy an applicable condition can disqualify a project.

The companies’ disclosures do not consistently identify which conditions apply to each site. A project awaiting verification and one requiring an eligibility exception have different unresolved issues, even if both describe their status as conditional.

For readers following the mining industry’s AI expansion, the useful comparison is therefore project by project: capacity already operating, capacity preserved as Base Load, requested capacity still awaiting allocation, and the remaining steps before customers can use it.

The 2021 announcements asked investors to look forward from machine orders to future hashrate. Today’s power announcements ask them to look forward from grid access to future computing revenue. Batch Zero makes some of those paths clearer. The next test is how many of the headline megawatts become operating facilities—and when.



Source link

  • Facebook
  • Twitter
  • Pinterest
Tags: Bitcoin
CryptoExpert

CryptoExpert

Recommended For You

This Fractal Bitcoin Mining Profitability Looks WRONG…

by CryptoExpert
September 13, 2026
0
This Fractal Bitcoin Mining Profitability Looks WRONG…

Check on YouTube

Read more

Canaan revenue misses guidance; 1,117 BTC pledged in Q2

by CryptoExpert
September 13, 2026
0
Canaan revenue misses guidance; 1,117 BTC pledged in Q2

Canaan, the Bitcoin mining-equipment maker, reported second-quarter 2026 revenue below its earlier guidance on Sept. 8, as weaker machine demand put more weight on its cash and crypto...

Read more

Solo Bitcoin Miner Hits $244K Jackpot After Nearly 40-Day Drought

by CryptoExpert
September 12, 2026
0
Solo Bitcoin Miner Hits $244K Jackpot After Nearly 40-Day Drought

Key TakeawaysBraiins Solo landed block 966351, handing one miner the full 3.147 BTC reward.Foundry and Antpool face a rare solo win after Bitcoin went nearly 40 days without...

Read more

Bitcoin mining supplies 90% of HIVE’s $1 million daily revenue despite ongoing AI expansion

by CryptoExpert
September 11, 2026
0
Bitcoin mining supplies 90% of HIVE’s $1 million daily revenue despite ongoing AI expansion

HIVE Digital Technologies said its Bitcoin-mining and GPU-cloud businesses generated more than $1 million in combined average daily revenue from Aug. 21 through Sept. 10, quantifying how much...

Read more

The 170HX Can Now PCIe Gen3.0 x16?! This Is INSANE…

by CryptoExpert
September 10, 2026
0
The 170HX Can Now PCIe Gen3.0 x16?! This Is INSANE…

Check on YouTube

Read more
Next Post
Analyst Says $3,000 Is Possible This Week

Analyst Says $3,000 Is Possible This Week

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Browse by Category

  • Altcoin News
  • Bitcoin News
  • Blockchain News
  • Business
  • Doge News
  • Ethereum News
  • Finance
  • Market Analysis
  • Mining
  • NFT News
  • Politics
  • Regulation
  • Technology
  • Trending Cryptos
  • Video

Sitemap

  • Market Cap
  • Donations
  • Trading
  • Mining
  • Contact

Legal Information

  • Privacy Policy
  • Anti-Spam Policy
  • Copyright Notice
  • DMCA Compliance
  • Social Media Disclaimer
  • Terms Of Service

Categories

  • Altcoin News
  • Bitcoin News
  • Blockchain News
  • Business
  • Doge News
  • Ethereum News
  • Finance
  • Market Analysis
  • Mining
  • NFT News
  • Politics
  • Regulation
  • Technology
  • Trending Cryptos
  • Video

© Copyright 2024 InvestInCryptoNews.com

No Result
View All Result
  • Home
  • Latest News
    • Bitcoin News
    • Altcoin News
    • Ethereum News
    • Blockchain News
    • Doge News
    • NFT News
    • Video
    • Market Analysis
    • Business
    • Finance
    • Politics
    • Mining
    • Regulation
    • Technology
  • Top 10 Cryptos
  • Market Cap List
  • IC DAO
  • Donations
  • Contact
  • Buy Crypto

© Copyright 2024 InvestInCryptoNews.com

This website is using cookies to improve the user-friendliness. You agree by using the website further.

Privacy policy
bitcoin
Bitcoin (BTC) $ 78,815.00
ethereum
Ethereum (ETH) $ 2,531.93
tether
Tether (USDT) $ 0.999853
bnb
BNB (BNB) $ 724.72
xrp
XRP (XRP) $ 1.42
usd-coin
USDC (USDC) $ 0.999893
solana
Solana (SOL) $ 102.98
tron
TRON (TRX) $ 0.34103
staked-ether
Lido Staked Ether (STETH) $ 2,265.05
figure-heloc
Figure Heloc (FIGR_HELOC) $ 1.01

Pin It on Pinterest

Are you sure want to unlock this post?
Unlock left : 0
Are you sure want to cancel subscription?